Post-Construction Clean-Up
Bathrooms
Sheetrock mud is dissolved and removed
All fixtures: dusted, cleaned as necessary, rinsed, and dried
All mirrors: polished, ensuring a streak-free shine
All labels/stickers: removed from toilets and fixtures
Kitchens
Cabinets: cleaned out, removing all shavings and dust (from drilling holes)
Cabinet handles: polished, removing fingerprints
Refrigerator (if any): cleaned out, removing tape and interior packaging from the moving process, all stickers removed
Stove and oven: everthing is cleaned out and dusted, removing any stickers and interior packaging from the moving process
Microwave: the microwave is cleaned out, removing any stickers or packaging
Other
Floors: vacuumed and washed, usually washed more than once as necessary
Floors: vacuumed and washed, usually washed more than once as necessary
Baseboards/moldings/spindles: dusted and cleaned
Light fixtures: dusted and cleaned, and all stickers removed
Walls: dry dusted as necessary to remove loose dust
Windows: cleaned inside and outside of tilt-in windows, all stickers removed
Glass doors: cleaned inside and outside
Door Knobs: polished as necessary to remove fingerprints and dust
Cabinets/built ins: vacuumed and cleaned out to remove dust, wood shavings, etc.